44.3 Recommendations
- Incremental Testing
- Always begin with a small fraction of the data to validate your HPC pipeline and catch issues early.
- Collect critical metrics:
- Run time (both wall clock time and CPU time).
- CPU utilization (are all requested cores working efficiently?).
- Memory usage (peak RAM consumption).
- Use tools such as
system.time()
,profvis::profvis()
, orRprof()
in R to profile your code locally before scaling.
- Resource Allocation
- Use test metrics to guide your resource requests (memory, cores, and wall time).
- Avoid:
- Under-requesting: jobs may fail due to out-of-memory (OOM) errors or timeouts.
- Over-requesting: results in longer queue times, resource underutilization, and potential policy violations on shared systems.
- Rule of thumb:
- Request slightly more memory than observed usage (e.g., 10-20% buffer).
- Request wall time based on observed run time, plus an additional safety margin (e.g., 15-30%).
Parallelization Strategy
- Identify tasks that can be embarrassingly parallel:
- Monte Carlo simulations.
- Bootstrap resampling.
- Model fitting on independent data partitions.
- Focus on minimizing communication overhead:
- Send only essential data between processes.
- Use shared-memory parallelism when possible to avoid data duplication.
- For distributed nodes, serialize and compress data before transmission when feasible.
- Identify tasks that can be embarrassingly parallel:
Monitoring and Logging
- Use HPC job scheduler logs to track job performance:
- Slurm:
sacct
,scontrol show job
, orseff
. - PBS/SGE: check standard output/error logs and resource summaries.
- Slurm:
- Capture R logs and console output:
- Direct output to log files using
sink()
or by redirecting standard output in your job script.
- Direct output to log files using
- Record:
- Start and end times.
- Memory and CPU metrics.
- Warnings and error messages.
- Use HPC job scheduler logs to track job performance:
Scaling
- For large-scale runs (e.g., 100x your initial test), do not jump from small-scale to full-scale directly.
- Run intermediate-scale tests (e.g., 10x, 50x).
- Confirm resource usage scales as expected.
- Watch for non-linear effects:
- Increased I/O overhead from parallel file reads/writes.
- Communication overhead in distributed tasks.
- Load balancing inefficiencies (stragglers can delay job completion).
- For large-scale runs (e.g., 100x your initial test), do not jump from small-scale to full-scale directly.
Future-Proofing
- HPC hardware and software evolve rapidly:
- Faster networks (InfiniBand, RDMA).
- Improved schedulers and resource managers.
- Containerization (Docker, Singularity) for reproducible environments.
- Regularly test and validate reproducibility after:
- Software/package updates.
- Hardware upgrades.
- HPC policy changes (e.g., new quotas or job priorities).
- HPC hardware and software evolve rapidly: